Residential/Commercial
Design Objective
To meet/exceed all state & local code requirements. In addition, utilize your investment to achieve the “BEST VALUE” for your dollars spent. FISCHER IRRIGATION is a Hunter “GOLD Preferred Contractor” with over 20 years of experience designing and installing Sprinkler Systems.
Key Design Features
- Strict tolerance to head spacing, this ensures better coverage & a higher precipitation rate.
- Use of HUNTER flow control valves. This enables proper nozzle pressure which, decreases water loss due to evaporation and ensures proper coverage.
- Zoning based on; exposure, soil, and plant type, to eliminate “feast famine syndrome.”
- We use 4”, 6” and 12” pop ups, to eliminate risers, (“sticks with nozzles), for aesthetic purposes when system is not running and to maintain coverage after plant growth occurs.
- Infield Valve wiring is all 16 gauge, solid copper, UF rated, either buried or in conduit (NO EXPOSED WIRE).
- Sod Cutting and additional time and care in the final cleanup. Use of surfactant on all trenches and disturbed grass to minimize shock and expedite recovery of grass.
- Main line Sch 40 PVC.
- 8”-12” main trench depth.
- Rotors installed on square spacing (head to head) app. .6 in/hr precipitation rate.
- Sprays installed on square spacing (head to head) or, triangular spacing (distance shortened to .86 Radius) appx. 1.5 + in/hr precipitation rate.
Components
- We used premium components with advanced features.
- Hunter Pro Series Sprays w/heavy duty case, interchangeable nozzles and replaceable seal.
- Hunter Pro Series Controller (expandable to 15 zones,) rain sensor recognition with bypass, non-volatile 100 year memory (NO BATTERY required), three independent programs w/4 starts @, with even/odd, day of week or Interval day scheduling, metal oxide varister for superior surge protection. Remote ready.
- Hunter SRV Valves with Flow Control for proper nozzle pressuring.
- Brass, pressured vacuum breaker insulated & taped w/UV resistant tape.
- Isolation valve w/access box.
Serviceability
- Each valve is isolated in its own valve box, with expansion coils for quicker, easier service access and testing.
- Trained/Experienced service crew ( 2-men ) and 8am to 5pm service desk for immediate service scheduling, w/24 hr. LIVE answering service.
Choosing a Contractor
The most important item on a proposal is the company of which tendered the proposal. You should get as much information about the company and their history as possible. A few basics are length of time es
Read more ...